Leave Your Message
The ease of installation of JTStrip insulation strips: Comparative advantages of dry construction vs. wet adhesive application 
Industry News
News Categories
Featured News

The ease of installation of JTStrip insulation strips: Comparative advantages of dry construction vs. wet adhesive application 

2025-12-25

The ease of installation of JTStrip insulation strips: Comparative advantages of dry construction vs. wet adhesive application 

In the building envelope system, the installation rhythm of insulation strips often determines the breathing frequency of the entire project. Especially in cross-border projects, where there is a rush to meet deadlines and seize key points, the biggest concern is getting stuck due to lack of smooth process coordination. Wet adhesion relies on weather and working hours, while dry construction seems faster, but many teams are unsure about it. This article, based on practical project experience, explains the two methods separately. After reading, you will be able to clearly understand which method is more suitable for your site conditions, personnel configuration, and delivery pressure. Now, let's get straight to the point. 

Why the installation method can affect the success of a project
Those who have worked on overseas projects know that insulation installation is not an isolated process. It is attached to the exterior surface, affects air tightness, and is also linked to the scheduling of workers. Choosing the wrong method will either result in wasted time waiting for the glue to dry or require rework by breaking through the wall, increasing hidden costs. The two main methods of installing JTStrip insulation strips - dry method and wet method - are suitable for different scenarios. The difference lies not only in the steps but also in the rhythm and controllability. 

Is dry construction really that fast?
With dry construction, there's no need to wait for the glue to cure, and it's not affected by sudden rain or temperature drops. It relies on the self-interlocking structure of the profiles, combined with simple on-site fixation, to achieve stable assembly. 
Last year, we undertook a warehousing project in Poland. For the exterior walls, we used JTStrip for dry installation of insulation strips. In November, the local temperature had dropped to zero degrees, and the wet method was basically suspended. After switching to the dry method, the team followed the positioning templates and completed over 300 meters of installation in one day. This was two days ahead of the original schedule for panel sealing. The on-site supervisor said that such a speed was rarely seen in winter construction. 
Some people are concerned that the dry method might not be sturdy. In fact, the JTStrip uses slots combined with elastic locking mechanisms, which can withstand common changes in wind pressure. In the EU CE certification, its tensile pull-out value is much higher than that of conventional pasting methods. 
The other frequently asked question was: Is the manual method very demanding for the workers? Actually, by using an impact drill to make fixed holes and then embedding strips according to the template, one can basically get the job done. We trained a group of temporary workers from Southeast Asia, and they could handle it independently in just half a day. 

Customized-AEROGEL-Structual-Sandwich-Panel2.jpg

How is the cost calculated? Is the dry method more cost-effective?
For wet adhesion, apart from buying the glue, one also needs to purchase a scraper, cleaning agent, and sometimes even have to do a second leveling to ensure quality. The process is one step following another, and the labor cost is considerable. 
A domestic manufacturer specializing in the export of curtain walls conducted two tests for an African project. With the same area and the same number of workers, the wet method resulted in an average of less than 30 meters completed per person per day. Switching to the dry method increased the output to over 45 meters. Calculated in terms of cost, approximately 1 yuan was saved per square meter. When summed up for large projects, the difference was quite obvious. 
Another question that is often asked is: Will the dry method reduce the sealing performance because it saves the glue? In fact, sealing mainly depends on the profile structure and installation accuracy. The continuous slots of JTStrip can prevent air convection, while the glue joints of the wet method are more likely to develop tiny cracks due to aging over time. 
In a high-rise residential project in India, the original team was accustomed to using wet construction methods. However, the local adhesive supply was unstable and often interrupted. Later, they switched to dry construction methods, directly using standard templates and screws for fixation. This way, they were no longer affected by fluctuations in material supply, and the overall progress was improved. 

The weather is not cooperating. Which one can withstand it better?
The biggest enemy of the wet method is low temperature and high humidity. The glue reacts slowly or even fails, and the adhesion strength also decreases. When construction is carried out in the north or at high altitudes in winter, workers often have to stay idle due to this. 
The dry method relies on mechanical bonding and is less sensitive to temperature and humidity. We tried it in a ski resort project in Canada. We could install it at -18℃. After conducting airtightness tests on site, it passed the test successfully. The owner was astonished and said that this was something unimaginable in previous wet construction methods. 
Someone asked, is the seismic protection system reliable with the dry method? The slots of JTStrip have a small displacement margin, which can absorb minor vibrations. The Japanese partner conducted a simulated vibration test in Kobe, and it met the local building seismic safety standards. 
Similar situations have also occurred in South America. In a commercial building project in Chile, the construction site was near the sea and had heavy humidity. The wet adhesive layer blistered and fell off. After changing to a dry method, the installation was completed in one go, and there were no more bonding problems in the subsequent process. 

Aerogel Insulation Board.JPG

In the future, if you need to replace or repair it, where is the convenient dry method?
The insulation strip is not a permanently fixed component. If you need to renovate or partially replace it after many years, the disadvantage of the wet method is that the adhesive layer is difficult to clean, and when removing it, it may damage the base layer. 
The dry installation method is relatively efficient. Once the clips are released, the entire piece can be pulled out. The new strip is then inserted and repositioned. One area can be completed in just a few minutes. We tried this method during a mall renovation in Dubai. Originally, it was expected to take two days to dismantle and replace, but the work was completed in just half a day, and the merchants hardly noticed the impact of the construction.
Some people are concerned about the short lifespan of the dry method. JTStrip uses modified polyamide profiles, and its aging resistance has been verified in multiple climate zones. In an Australian school project, after being installed for twelve years, the inspection showed that the integrity rate was above 90%, which was not much different from when it was newly installed. 

Q&A
1. Can dry construction be used for all walls? 
Most solid or frame walls can be used, but curved or specially shaped ones require custom templates to be made in advance. Otherwise, the positioning may be inaccurate.
2. What are the advantages of wet construction now? 
When the base surface is very flat and the construction period is flexible, wet construction can achieve almost seamless jointing, with a finer appearance. However, its overall efficiency and stability are not as good as dry construction.
3. Does dry installation require special equipment? 
Generally, an electric drill, screwdriver, and positioning template are sufficient. It does not rely on large machinery and is suitable for scenarios with limited manpower or for rapid deployment across borders. 

From the perspective of multiple cross-border projects, the dry construction method of JTStrip insulation strips has obvious advantages in terms of installation convenience. It allows the team to be less affected by weather conditions, reduces waiting time between processes, and makes later maintenance easier. For cross-border buyers, end consumers, and B-end customers, this means more stable delivery and lower overall risks. If your project values rhythm and controllability, you might consider prioritizing the dry construction method. The installation convenience of JTStrip insulation strips can become a reliable means for you to shorten the construction period and improve quality.